嗯快点别停舒服好爽受不了了_爽好舒服快受不了了老师_国产精品国产三级国产专区5o_国产成人精品微拍视频

NHI Headlines

On April 8th morning, along with a "rumble" roar, NHI "Cooperation 2" Tunnel Boring Machine (TBM for short) started tunneling at the 17m underground construction site of Culture West Road Station of metro line 10. Compared with other TBM, this TBM made by NHI is more humane with reasonable spatial distribution and its cutter parameters are more suitable for Shenyang soil. "Cooperation 2" TBM complete the installation of 20 ring segments within 24 hours.